Enterprise software used to be the part of the IT budget nobody questioned. In late 2026 that has changed. A CIO.com feature published November 10, 2026 describes IT leaders putting VMware, SAP's ERP suites and Oracle Java on their replacement lists, driven by rising license costs, end of support dates and the idea that AI assisted coding makes building some software cheaper. This guide explains what changed for each product, what the realistic alternatives are, and how a procurement team can plan an exit, or use one as leverage, without disrupting the business.

The short version: the vendor changed the deal

Brad LaPorte of Lionfish Tech Advisors summarized the pattern for CIO.com: "The vendor changed the deal, not the software." VMware changed price and packaging, SAP put a clock on ECC, and Oracle switched Java to per employee pricing in 2023. The software kept working; the economics did not.

Product What changed Main driver to leave Typical exit difficulty
SAP ECC (Business Suite 7) Mainstream maintenance ends end of 2027; optional extended maintenance to end of 2030 Forced move to S/4HANA subscriptions, or paying more to stay High; most realistic options are SAP's newer ERP, another ERP or third party support
VMware Broadcom raised prices significantly after buying VMware Higher renewal costs and repackaging Very high; up to four years to untangle, per an advisor quoted by CIO.com
Oracle Java SE Licensed per employee since 2023 Paying for every employee, not just Java users Low to moderate; mainly a runtime replacement

How big is the shift?

The data points in the CIO.com article show strong intent but slower action:

Finding Figure Source as cited by CIO.com
IT leaders at VMware customers looking for alternatives 90% Rimini Street survey
IT decision makers at large North American companies reducing VMware use 86% CloudBolt survey released in February
Of those, share that have moved three quarters of their environment off VMware 2% CloudBolt survey
IT leaders actively reconsidering core systems such as ERP and CRM About 22% Gartner research

Patrick Connaughton, chief of research at Gartner, told CIO.com that IT leaders "aren't planning wholesale replacements of core systems yet", although more than nine in ten expect disruption in the software market. Institutional trust, regulation and data lock-in keep most incumbents in place for now.

The lesson for buyers: wanting to leave is common, finishing the move is rare. Plan accordingly.

SAP ECC: the 2027 deadline

SAP's maintenance strategy page states that SAP will provide mainstream maintenance for SAP Business Suite 7 core applications until the end of 2027, followed by optional extended maintenance until the end of 2030. Extended maintenance "comes with a premium of two percent points on the maintenance basis" and runs from the beginning of 2028 to the end of 2030.

That leaves ECC customers four realistic paths:

  1. Move to SAP S/4HANA or SAP Cloud ERP. The path SAP is pushing, typically via RISE with SAP or SAP GROW subscriptions. LaPorte's comment to CIO.com was that for SAP customers "the most likely next address is SAP's newer building, on SAP's schedule."
  2. Buy extended maintenance to 2030 and use the time to plan properly, at a higher annual cost.
  3. Switch to third party support, which some companies use to keep ECC running while they decide. Rimini Street and Spinnaker Support are examples of vendors in this market.
  4. Replace SAP with another ERP. See our comparison of the Gartner Leaders in cloud ERP for manufacturers and distributors for the main options.

John Burns of Herc Rentals described a fifth tactic to CIO.com: surround the ERP with best of breed tools so the core can be unplugged on your own timeline. He also warned that "on every ERP and enterprise performance management migration I've run, the license was the smallest line item."

VMware: the hardest exit

After Broadcom's acquisition of VMware, price rises turned virtualization from "a quiet line item into a board-level number", in the words of fractional CIO Kevin M. Coles. The alternatives are well known:

  • Microsoft Hyper-V, often attractive to Windows heavy estates.
  • Nutanix, a commercial hyperconverged platform.
  • Proxmox Virtual Environment, open source with optional paid subscriptions.
  • Public cloud or containers, for workloads that can be re-platformed rather than lifted.

Proxmox is one of the few alternatives with a public price list. Its subscription page, checked November 11, 2026, shows:

Proxmox VE subscription Price per CPU socket per year Support included
Community 120 euros Enterprise repository; community forum only
Basic 370 euros 3 tickets per year, 1 business day response
Standard 550 euros 10 tickets per year, 4 hour response, 24/7
Premium 1,100 euros Unlimited tickets, 2 hour response, 24/7

License price is rarely the deciding factor, though. LaPorte compared VMware to "the house you've lived in for 15 years, with wiring from half your business running through the walls." Backup tools, monitoring, networking, security agents and runbooks are all tied to it, and you will run two estates in parallel for years.

Oracle Java: the easiest exit

Oracle's Java SE Universal Subscription FAQ, checked November 11, 2026, says the subscription is sold by an employee based metric. Published pricing:

Organization size Oracle Java SE Universal Subscription price
1 to 10 employees $100 per year
11 to 100 employees $1,000 per year
101 to 500 employees $10,000 per year
501 to 2,999 employees $10,000 per year plus $147.20 per employee above 500
3,000 or more employees From $10.50 per employee per month, with published tiers as low as $5.25

For example, a company with 1,200 employees would pay $10,000 plus 700 times $147.20, or $113,040 per year, even if only a few dozen staff run Java applications. Oracle's price list defines who counts as an employee; read it before you count.

The alternative is a supported OpenJDK distribution such as Eclipse Temurin (Adoptium), Amazon Corretto or a commercially supported build. LaPorte compared Java to a studio apartment, where you "pack a few boxes and you're out." The real work is discovery: finding every Java runtime on servers, desktops, build pipelines and vendor appliances, then testing compatibility.

The real cost of switching

All three experts quoted by CIO.com made the same point: the license is the visible cost, not the biggest one. Budget for:

Cost Why it is often missed
Undocumented integrations Nobody owns them until they break
Reports finance relies on Rebuilt late, under deadline pressure
Staff skills Teams know one console; training and hiring take time
Parallel running Two estates, two patch cycles, two sets of admin accounts, for two to four years
Security exposure The old environment gets less attention while it is still live
Business disruption Ask the CFO how many disruption days are acceptable; if the answer is zero, rethink

Our total cost of ownership guide shows how to put these into a three year model.

Step 1: Inventory before you price

"Map every workload, every integration, and every admin account that touches the platform, and only then price the exit," LaPorte advised. For Java, that means every runtime and version. For VMware, every VM, host, backup job and dependency. For SAP, every custom object, interface and report.

Step 2: Check what you are contractually committed to

Pull renewal dates, notice periods, true up clauses and audit rights for each vendor. Our SaaS contract checklist lists the clauses that matter. Note the date by which a decision must be made to avoid auto renewal or a new multi year term.

Step 3: Price the exit, including parallel running

Get quotes for the replacement, migration partner and training, then add the cost of running both environments for the realistic overlap period. Coles' test: if nobody can answer how long a switch will take and what a day of disruption costs, "you're not ready to negotiate, let alone migrate."

Step 4: Check that the alternative is independent

Coles also advised checking whether the replacement depends on the same identity, cloud or integration layer you are trying to reduce reliance on. Swapping one dependency for another only moves the lock-in. Use our vendor risk management guide to assess the new supplier.

Step 5: Use the plan in the negotiation, then decide

"Even if you stay, a credible exit plan is the best leverage you'll ever have in the negotiation," Coles told CIO.com. Share enough of the plan with the incumbent to show you can leave, then compare their best offer with the full cost of moving. Our SaaS negotiation playbook covers timing and tactics.

Step 6: Protect the old estate during migration

Assign owners for patching and access on the system you are leaving. LaPorte warned that "the old house is the one that gets broken into," because attention moves to the new environment while the old one is still running.

Third party support: a bridge, not a destination

For SAP in particular, third party support is often the option that buys time. Independent providers support the software you already run, usually for a lower annual fee than the vendor's maintenance, and without forcing an upgrade. It suits companies that want to keep a stable ECC system running while they decide what comes next. Weigh it carefully:

Consideration What to check
Cost Compare the provider's quote with the vendor's maintenance, including the 2 percentage point premium for SAP extended maintenance
Scope Which fixes, tax and legal updates and security patches the provider covers
Return path What the vendor charges to come back to its own maintenance later, and whether back maintenance applies
Upgrade rights What you give up by leaving vendor maintenance, such as rights to new releases
Security How the provider handles vulnerabilities in code it does not own

Ask the provider for references with a similar system and the same countries. Treat third party support as a way to plan a move on your own timeline, not as a permanent answer.

Exit readiness checklist

Before you open a negotiation or commit to a migration, confirm you can answer yes to each:

  • We have a complete inventory of workloads, integrations, reports and admin accounts.
  • We know our renewal dates, notice periods and audit rights.
  • We have a priced exit, including parallel running, training and partner fees.
  • We know how many days of disruption the business can accept.
  • The replacement does not recreate the same dependency elsewhere.
  • Someone owns security on the old environment until it is switched off.
  • We have a fallback if the migration runs late, such as extended maintenance or third party support.

What this means for small and mid sized businesses

Most SMBs do not run SAP ECC or large VMware estates, but the pattern applies to every renewal: vendors change packaging, add AI tiers and raise prices at renewal. Two lessons transfer directly:

  • Keep an exit plan for every critical system, even a one page one, so you know your options before the renewal notice arrives.
  • Check Java now. If any of your servers, desktops or vendor tools run Oracle Java, the employee metric can make a small footprint expensive, and switching runtimes is usually quick.

If you are rethinking your stack more broadly, our guides to build vs buy and all in one suites vs best of breed tools help frame the choice.

Bottom line

SAP's 2027 maintenance deadline, Broadcom's VMware pricing and Oracle's per employee Java metric are pushing IT leaders to look for alternatives, but surveys show far more intent than completed moves. Treat each product differently: Java is a contained project, VMware is a multi year program, and SAP usually becomes a choice between SAP's own cloud, another ERP or third party support. Inventory first, price the whole exit including parallel running, and use the plan as leverage whatever you decide.

Frequently asked questions

When does SAP ECC support end?

SAP says it will provide mainstream maintenance for SAP Business Suite 7 core applications until the end of 2027, followed by optional extended maintenance until the end of 2030. Extended maintenance carries a premium of two percentage points on the maintenance basis.

How is Oracle Java SE licensed in 2026?

Oracle sells the Java SE Universal Subscription on an employee based metric. Its FAQ lists small and midsize pricing of $100 per year for 1 to 10 employees, $1,000 for 11 to 100, $10,000 for 101 to 500, and $10,000 plus $147.20 per employee above 500 for 501 to 2,999. Enterprise pricing starts at $10.50 per employee per month for 3,000 or more employees.

What are the alternatives to Oracle Java?

Most companies move to a supported OpenJDK distribution, such as Eclipse Temurin from the Adoptium project, Amazon Corretto, or a commercially supported build from vendors such as Azul. The work is mostly finding every Java installation, checking version compatibility and replacing the runtime.

What are the alternatives to VMware?

Common options include Microsoft Hyper-V, Nutanix, open source Proxmox Virtual Environment, and moving workloads to public cloud or containers. Proxmox VE is free software with optional subscriptions from 120 euros per CPU socket per year for repository access up to 1,100 euros for premium support.

How long does it take to leave VMware?

An advisor quoted by CIO.com says untangling from VMware can take up to four years. A CloudBolt survey cited in the same article found that 86% of IT decision makers at large North American companies were reducing their VMware use, but only 2% had moved three quarters of their environment.

Should we leave even if switching is expensive?

Not always. The license is often the smallest part of the switching cost. Build a credible exit plan with real costs and timelines, then decide. Even if you stay, the plan strengthens your position in the renewal negotiation.

Sources

  1. CIO.com: IT leaders seek alternatives for SAP, VMware, and Java, by Grant Gross, November 10, 2026
  2. SAP Support: Maintenance strategy for SAP S/4HANA and SAP Business Suite 7 (checked November 11, 2026)
  3. Oracle: Java SE Universal Subscription FAQ, pricing (checked November 11, 2026)
  4. Proxmox Virtual Environment subscription pricing (checked November 11, 2026)
  5. CloudBolt: New research, 86% of companies actively reducing their VMware footprint
  6. CIO.com: IT leaders still on the hunt for VMware alternatives, October 16, 2026